Short answer: Partly—but not literally. Elon Musk did not predict that the world would physically run out of electricity or that every transformer would disappear in 2025. In a November 2023 interview, he described a sequence of approximate bottlenecks: AI chips first, voltage step-down transformers next, and broader electricity constraints after that. By 2025, energy analysts were reporting real transformer, grid-connection and data-center power bottlenecks. The headline is therefore directionally credible but rhetorically overstated.
What Elon Musk actually predicted
The claim comes primarily from Lex Fridman Podcast #400, published on November 9, 2023. Musk said the immediate constraint on artificial intelligence was the supply of silicon or AI chips. He then expected a shortage of voltage step-down transformers in roughly a year, followed by electricity shortages in roughly two years.
As an Amazon Associate I earn from qualifying purchases.
Read from the interview date, that implies approximate windows of 2024 for transformer constraints and 2025 for broader electricity constraints. But Musk did not provide a formal forecast with a defined country, market, quantity or deadline. “About a year” and “about two years” were rough estimates, not a precise announcement that the world would run out of two resources simultaneously in calendar year 2025.
The transcript also places the issue in a wider electrification story. Musk discussed electricity demand from AI alongside electric vehicles and electric heating, and argued that additional generation and batteries would be needed to handle demand and peaks.
#1 Best Overall
- 425VA/260W Standby Uninterruptible Power Supply (UPS): Uses simulated sine wave output to provide battery backup power and to safeguard home office, home entertainment including computers, gaming consoles, and broadband routers
- 8 NEMA 5-15R OUTLETS: Four battery backup & surge protected outlets; Four surge protected outlets; INPUT: NEMA 5-15P right angle, 45 degree offset plug with five foot power cord
- ADDITIONAL FEATURES: LED status light indicates Power-On and Wiring Fault, transformer-spaced outlets
- GREENPOWER UPS HIGH EFFICIENCY DESIGN: Reduces power consumption by utilizing a compact charger and power inverter to create an ultra-efficient backup power system for home and office use
- 3-YEAR WARRANTY – INCLUDING THE BATTERY; 75K USD Connected Equipment Guarantee; UL SAFETY CERTIFIED: Product has been tested in a UL certified lab and listed with UL as meeting or exceeding safety standards
Why the word “run out” is misleading
In infrastructure discussions, a shortage rarely means that a resource has vanished. It can mean that equipment cannot be manufactured, delivered or connected quickly enough to meet demand at a particular place and time.
- Electricity shortage: insufficient generation, transmission or local delivery capacity for planned demand—not the exhaustion of the planet’s electricity supply.
- Transformer shortage: too few suitable units available within the required procurement and construction schedule—not the disappearance of all transformers.
- 2025 prediction: an approximate interpretation of Musk’s two-year estimate, not a date he explicitly stated.
A data center can face a power constraint even when its country has adequate annual electricity production. The problem may be a local substation, a transmission line, an interconnection approval or the ability to supply several hundred megawatts during peak periods.
What a transformer shortage means
Musk was referring to electrical transformers, not the transformer architecture used by many AI models. Electrical transformers change voltage. Power typically moves through the grid at high voltage, then passes through substations and other equipment that steps it down to levels usable by a data center and its computing systems.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
An AI campus may require much more than a single transformer. Its electrical system can include:
- utility-scale or large power transformers;
- substations and medium-voltage equipment;
- switchgear, cabling and protection systems;
- onsite transformers serving individual buildings or equipment areas;
- backup generators, batteries and power-conversion equipment.
These components are not interchangeable in the way software servers can sometimes be. Specifications depend on voltage, capacity, reliability requirements, utility standards and site design. Large transformers also require specialized manufacturing, testing and transport.
The supply chain includes copper, electrical steel, insulation and other materials. Factories cannot expand output as quickly as an AI developer can order additional computing hardware. Design, certification, manufacturing, shipping and installation can all become part of the schedule.
The International Energy Agency reported that wait times for critical grid components, including transformers and cables, had doubled over the preceding three years. That supports Musk’s underlying mechanism, but it does not establish a global physical depletion of every transformer category. The IEA’s Energy and AI executive summary discusses these constraints.
Recommended Free Tools
Rank #2
- 1500VA/1000W PFC Sinewave Uninterruptible Power Supply (UPS): Uses sine wave output to provide battery backup power for Active PFC & conventional power supplies; Safeguards computers, workstations, network devices, and telecom equipment
- 12 NEMA 5-15R OUTLETS: 6 battery backup & surge protected outlets, 6 surge protected outlets; INPUT: NEMA 5-15P right angle, 45 degree offset plug with 5 foot power cord; 2 USB charge ports (1 Type-A, 1 Type-C) quickly charge phones and tablets
- MULTIFUNCTION, COLOR LCD PANEL: Displays immediate, detailed information on battery and power conditions; Color display alerts users to potential issues before they can affect critical equipment and cause downtime; Screen tilts up to 22 degrees
- AUTOMATIC VOLTAGE REGULATION (AVR): Corrects minor power fluctuations without switching to battery power; UL SAFETY CERTIFIED: Product has been tested in a UL certified lab and listed with UL as meeting or exceeding safety standards
- 3-YEAR WARRANTY – INCLUDING THE BATTERY; $500,000 Connected Equipment Guarantee; FREE PowerPanel Management Software (Download)
Why AI data centers use so much power
Modern AI facilities operate large numbers of GPUs or other accelerators, often in high-density racks. Training can run continuously for long periods, while inference demand grows as AI is built into search, software, customer service, media and other products.
Computing hardware is only part of the load. Data centers also need networking, storage, cooling, power conversion and redundancy. Cooling and electrical losses can be material, especially in high-density facilities.
Energy use varies widely. A short request to a small model does not consume the same amount of electricity as a long request to a large model. Consumption depends on the model, hardware, prompt and output length, batching, utilization, cooling system and location. It is therefore inaccurate to treat every AI query as having one fixed energy cost.
Efficiency is improving: better chips, software and models can reduce energy per task. But efficiency can also make AI cheaper to use, encouraging more usage. If demand expands faster than energy per task falls, total electricity consumption still rises.
The Tool Desk
Outbyte PC Repair FREEClear out junk files and repair common Windows errorsFree Scan →Outbyte Driver Updater FREEFix the driver behind crashes, sound loss and screen glitchesFind Drivers →What happened in 2025?
The strongest evidence supports a prediction of tightening infrastructure constraints, not literal global depletion.
The IEA reported that global data-center electricity use rose 17% in 2025, with AI-focused data centers growing faster than the overall data-center sector. Its assessment identified transformers, gas turbines, chips, grid connections and planning approvals among the bottlenecks affecting expansion. See the IEA’s 2025 data-center electricity update.
That means some developers faced longer waits or had to change their plans. A proposed facility might have funding and servers but still be unable to operate until a utility can provide a substation, transmission upgrade or approved interconnection.
Rank #3
- 625VA/360W Standby Uninterruptible Power Supply (UPS): Uses simulated sine wave output to provide battery backup power and to safeguard home office, home entertainment including computers, gaming consoles, and broadband routers
- 8 NEMA 5-15R OUTLETS: Four battery backup & surge protected outlets; Four surge protected outlets; INPUT: NEMA 5-15P plug with 5 foot power cord
- 2 USB CHARGING PORTS: Share 2.1 amps to charge and power tablets, smartphones, MP3 players, and other mobile devices; LED STATUS LIGHTS: indicates Power-On and Wiring Fault
- GREENPOWER UPS HIGH EFFICIENCY DESIGN: Reduces power consumption by utilizing a compact charger and power inverter to create an ultra-efficient backup power system for home and office use
- 3-YEAR WARRANTY – INCLUDING BATTERY; Connected Equipment Guarantee up to 100,000; PowerPanel Management Software (Available for Download); UL SAFETY CERTIFIED: Product has been tested in a UL certified lab and listed with UL as meeting or exceeding safety standards
These problems are usually regional or project-specific. A country can have enough generation overall while a fast-growing data-center cluster lacks deliverable power. Conversely, a site may have nearby generation but insufficient transmission or distribution equipment.
Quick wins for a faster PC:
Repair Windows errors before they cause bigger problemsFix Now →Fix the driver behind crashes, sound loss and screen glitchesFind Drivers →Clear out junk files and repair common Windows errorsFree Scan →Four different power bottlenecks
“The grid” is not one single constraint. A useful analysis separates four stages:
- Generation: Are enough power plants producing electricity?
- Transmission: Can electricity travel from those plants to the relevant region?
- Distribution and substations: Can the local network deliver the required capacity to the facility?
- Interconnection and permitting: Has the project received the technical and legal approvals needed to connect?
A delay at any one stage can look like an electricity shortage to a data-center developer. Transmission projects can be especially slow; the IEA says new transmission lines can take four to eight years in advanced economies.
It is also important to distinguish power from energy. Power is the rate of electricity delivery, measured in watts or gigawatts. Energy is electricity consumed over time, measured in watt-hours or terawatt-hours. A facility can have a large peak-power requirement even if its annual energy use is a different issue.
AI did not cause every electricity constraint
AI is a major source of new demand, but it is not the only one. Data-center growth unrelated to AI, electric vehicles, heat pumps and building electrification, manufacturing expansion, cryptocurrency mining in some regions, population growth and extreme-weather peaks can all increase pressure on grids.
Do these 3 things before closing this tab:
1Fix the driver behind crashes, sound loss and screen glitches2Clear out junk files and repair common Windows errors3Scan for outdated or missing drivers - takes under a minuteMusk himself noted that electrified transport and heating could be larger near-term electricity drivers than AI. The correct question is not whether AI caused the entire power problem, but how much additional demand AI added to systems already facing competing needs.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.What solutions are being pursued?
There is no single fix. The options involve different costs, speeds, reliability characteristics and environmental effects.
Rank #4
- 12 NEMA 5-15R OUTLETS: Six battery backup & surge protected outlets; Six surge protected outlets (Three ECO controlled); INPUT: NEMA 5-15P right angle, 45 degree offset plug with five foot power cord
- MULTIFUNCTION LCD PANEL: Displays immediate, detailed information on battery and power conditions
- ECO MODE: When the UPS detects a computer is off or in sleep mode, it will automatically turn off power to computer peripherals connected to ECO mode outlets, reducing power usage and lowering energy costs
- 3-YEAR WARRANTY – INCLUDING THE BATTERY; $100,000 Connected Equipment Guarantee and FREE PowerPanel Personal Edition Management Software (Download)
| Approach | Potential benefit | Trade-off |
|---|---|---|
| Gas generation | Dispatchable power that can often be added relatively quickly | Emissions, fuel-price exposure, permitting and local pollution |
| Nuclear generation and plant life extensions | Firm, low-carbon electricity | High capital costs, regulatory complexity and long development timelines |
| Solar and wind with storage | Additional generation with potentially fast deployment | Transmission, land, equipment and storage-duration requirements |
| Batteries | Peak shifting and power-quality support | Cost, duration limits and material supply chains |
| Onsite generation and microgrids | Can reduce dependence on delayed grid upgrades | Expense, emissions, noise and permitting constraints |
| Efficiency and demand response | Reduces peak demand or energy per computation | May conflict with uninterrupted AI workloads |
| Transmission and grid upgrades | Unlocks generation and improves delivery capacity | Siting and permitting can take years |
Data-center operators are also considering workload scheduling, geographic relocation, more efficient models and improved data-center power utilization. These measures can reduce stress, but they do not eliminate the need for physical infrastructure when total demand continues to grow.
How large could the demand become?
The IEA projects that global data-center electricity consumption could double by 2030, while electricity use by AI-focused data centers could triple. Those are projections, not guaranteed outcomes, and they depend on adoption, efficiency, hardware deployment and infrastructure availability.
PC Slower Than It Used to Be?
A free scan shows the junk files, broken settings and background clutter dragging Windows down - then fixes them in one click.Free scan · Windows 10 & 11Crashes, No Sound, or Screen Glitches?
Random freezes, missing sound and display glitches usually trace back to one bad driver. Find and replace yours safely.Free scan · under a minuteFor the United States, the Department of Energy’s Data Center Resource Hub cites Lawrence Berkeley National Laboratory estimates that data centers could account for 11.8% of U.S. electricity use by 2030, with a model-dependent range of 9.5% to 15.3%. That estimate should not be merged with an earlier DOE-cited EPRI estimate of up to 9% of U.S. generation by 2030; they use different assumptions and measures.
What this could mean for electricity customers
Large new loads can lead utilities to build substations, transmission, generation and other infrastructure. Depending on local rules and contracts, those costs may be paid by data-center developers, shared among customers or recovered through utility rates.
Possible effects include higher wholesale prices in constrained markets, new tariffs or demand charges for large users, reliability concerns during extreme weather and political disputes over who should finance grid upgrades. There can also be benefits if data centers fund dedicated generation, improve local infrastructure or provide flexible demand.
AI data centers do not automatically raise every household’s bill. The outcome depends on the utility’s regulation, market design, location, cost-allocation rules and the terms negotiated with large customers. The U.S. Department of Energy discusses the broader reliability and resource-adequacy challenge here.
Free tools Windows power users keep installed
One-click scans. No signup required.
How accurate was Musk’s prediction?
| Dimension | Assessment |
|---|---|
| Timing | Roughly plausible, but approximate rather than precise |
| Transformer bottleneck | Supported by longer lead times and constrained equipment supply |
| Electricity bottleneck | Supported in some regions, project pipelines and grid-connection processes |
| Literal global depletion | Not supported |
| AI growth halted in 2025 | Not supported; expansion continued despite constraints |
| Overall | Directionally right, but overstated by the headline |
The fairest verdict is that Musk identified a real shift in AI economics: access to electricity and electrical infrastructure could become as important as access to chips. But his comments were an opinionated, approximate forecast—not an independent, system-wide prediction—and they did not specify a global 2025 depletion event.
What could change the outlook?
The severity of future constraints could be reduced by faster chip efficiency gains, smaller models, better software, slower-than-expected AI adoption, new generation and transmission, storage, demand response, data-center relocation or more onsite power.
Those developments could change where and when constraints appear. They would not make the original headline literally accurate in retrospect; they would show that infrastructure bottlenecks are moving targets rather than fixed deadlines.
Quick Recap