Driver FixRecommendedSound, Wi-Fi or graphics acting up? Check drivers firstFind missing or outdated drivers fast.Check DriversOctober DealsAmazon USOctober deal check: compare before you payAmazon US: current deals, useful picks and tech finds.Check DealsWindows FixRecommendedWindows errors stealing your time? Find the fix fastScan stability, cleanup and performance issues.Fix Now×
Skip to content
The Finance Base
The Money Desk · Blog
Re:

What Happened to the Proposed $600 Million Westfield Innaloo Expansion?

The proposed $600 million Westfield Innaloo expansion was deferred in 2019. Here’s what the 2017 plan included and what is known about its status.
From TheFinanceBase Team2 min to read
Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The proposed $600 million Westfield Innaloo expansion is not established as a current project. Scentre Group announced the proposal in 2017, then said in December 2019 that it had deferred the expansion and would preserve it as a longer-term opportunity. The available information does not confirm a revival, new approval or construction start.

What is the current status of the Innaloo expansion?

The latest dated project decision established here is Scentre Group’s 6 December 2019 announcement that it had decided to defer the expansion of Westfield Stirling, the name used for the centre in that statement. Scentre Group CEO Peter Allen said: “As a result of this significant change to our Perth portfolio, as well as Booragoon’s future development opportunities, we have decided to defer the expansion of Westfield Stirling.” Scentre Group’s 2019 statement

Allen also said the group intended to retain ownership and “preserve the development opportunity in the longer term.” That describes a deferred opportunity, not a confirmed construction schedule. No later revival, approval or construction commencement is established here.

What was included in the 2017 proposal?

Scentre Group announced an approximately $600 million proposal in 2017 that would nearly double the centre’s size. Its proposed components were:

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
#1 Best Overall
Walthers Modern Shopping Center II KIT
  • New in manufacturer packaging.
  • Realistic Detail.
  • Robust materials.
  • Original packaging.
  • Scale Miniature for For Model Trains and Dioramas.
  • David Jones and international mini-major retailers;
  • 100 new stores;
  • a lifestyle and entertainment precinct with restaurants; and
  • a 14-screen Event Cinemas complex relocated from its then-existing Innaloo location.

These were features of the 2017 announcement, not confirmed details of a current scheme. The approximately $600 million figure is the value Scentre Group attached to that proposal in 2017; it is not a verified current project budget. Scentre Group’s 2017 proposal announcement

What is at Westfield Innaloo now?

Scentre Group’s centre profile, titled Westfield Innaloo, describes an operating shopping centre 9 kilometres north-west of Perth CBD and 4 kilometres from Scarborough Beach. The owner lists 151 retailers, 47,179 square metres of gross lettable area, 2,395 parking spaces and 8.7 million annual customer visits. The profile does not state a reporting year for these centre figures, so they should be read as owner-published profile statistics rather than dated independent counts. Westfield Innaloo centre profile

Rank #2
Walthers Cornerstone N Scale Building/Structure Kit Modern Shopping Center I
  • Plastic model kit / accessories. Accessories category:
  • Accessories
  • Gauge N

The same profile gives trade-area figures with a stated 2025 reference: Scentre Group estimates total retail spend of $7.8 billion across the total trade area and $3.7 billion in the main trade area. It estimates main trade area spend per capita at $21,765, compared with a Perth Metro average of $18,501. These are the owner’s estimates, not figures for the proposed expansion.

Does the Stephenson Avenue project mean the expansion is proceeding?

No. The Stephenson Avenue Extension is a separate transport project. The City of Stirling says it connects activity hubs including Westfield Innaloo and forms part of the broader Stirling City Centre plan. Its page, last updated 16 April 2026, says Phase One opened to traffic on 11 February 2022 and Phase Two was expected to be completed in mid-2026. Transport works do not establish that the shopping-centre expansion has restarted or received approval. City of Stirling: Stephenson Avenue Extension

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Rank #3
HO Scale Shopping Mall Building Kit, Miniature Train Model Food Court with Steak, Bakery, Soft Drink, Dessert Shop, 26x7x7cm, Self-Assembly
  • HO SCALE BUILDING KIT: Detailed shopping mall model designed for HO scale train layouts and dioramas, featuring a food court with four distinct storefronts including Steak, Bakery, Soft Drink, and Dessert Shop
  • REALISTIC DESIGN: Colorful facade with striped awnings, transparent window details, and illuminated signage displaying "Shopping Mall Food Shopping Center" for authentic miniature scenery
  • COMPACT DIMENSIONS: Measures 26cm length x 7cm width x 7cm height (approximately 10.2 x 2.8 x 2.8 inches), perfectly scaled for HO gauge model railroad scenes and layouts
  • EASY ASSEMBLY REQUIRED: Self-assembly kit that can be easily put together without complex tools, allowing hobbyists to customize and build their miniature shopping center
  • INCLUDES MINIFIGURES: Comes with scale model figures to enhance realism and bring your miniature shopping mall scene to life with pedestrian details

A 2010 Western Australian Government statement also referred to an Innaloo retail expansion in the wider Stirling City Centre regeneration agenda. That is historical strategic context, not evidence of a current approval. Western Australian Government statement

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What would confirm a change in status?

A current statement from Scentre Group or a relevant planning authority record would be needed to establish that the project has been revived, redesigned or approved. Until then, the clearest account is that the 2017 proposal was deferred in 2019, with the development opportunity retained for the longer term.

Quick Recap

Bestseller No. 1
Walthers Modern Shopping Center II KIT
Walthers Modern Shopping Center II KIT
New in manufacturer packaging.; Realistic Detail.; Robust materials.; Original packaging.; Scale Miniature for For Model Trains and Dioramas.
$54.99
Bestseller No. 2
Walthers Cornerstone N Scale Building/Structure Kit Modern Shopping Center I
Walthers Cornerstone N Scale Building/Structure Kit Modern Shopping Center I
Plastic model kit / accessories. Accessories category:; Accessories; Gauge N
$54.98
Bestseller No. 4
SnapHouse Architectural Scale Model Building Kit, Ages 13+
SnapHouse Architectural Scale Model Building Kit, Ages 13+
Easy to Use: No special skills or additional materials are required; American Manufacturing: Made in the USA
$249.00
Bestseller No. 5
Outland Models Train Railway Shopping Centre/Mall w Parking Lot & Cars N Scale
Outland Models Train Railway Shopping Centre/Mall w Parking Lot & Cars N Scale
This product is created by a 3D printer; If you would like to paint this product, acrylic paints are recommended
$7.99
Best Value
Outland Models Train Railway Shopping Centre/Mall w Parking Lot & Cars N Scale
  • This product is created by a 3D printer
  • Just like most other 3D-printed products, when you look at it carefully you see the printing patterns, paint can be used to cover them if you don't want them visible
  • If you would like to paint this product, acrylic paints are recommended
  • Assembly is required but very easy, using glue is recommended
  • This item includes all accessories shown in the pictures
Rank #4
SnapHouse Architectural Scale Model Building Kit, Ages 13+
  • Custom Architectural Scale Models: Design and build custom Architectural Scale Models of your own unique house designs at 1:48 scale
  • Easy to Use: No special skills or additional materials are required
  • Reusable Parts: All parts are reusable so you can design, build, dismantle, and rebuild as often as you like
  • Versatile Design System: Each unique shape in the SnapHouse system can be used for multiple purposes and orientations
  • Flexible Architectural Styles: Create your own architectural style from traditional to ultra-modern and everything in between

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Leave a Reply

Your email address will not be published. Required fields are marked *

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

More post from the Money Desk

  1. The Money DeskBlogTheFinanceBase09 OCT 267 minMortgage Escrow FAQs: Taxes, Insurance, Shortages, and Refunds
  2. The Money DeskBlogTheFinanceBase09 OCT 265 minHow Mortgage Escrow Accounts Work and What Homeowners Pay For
  3. The Money DeskBlogTheFinanceBase09 OCT 265 minHow to Read a Stock Chart, Volume and Market-Cap Data
Recommended PC Tool
Recommended PC Tool
Windows Errors? Fix Them Before They SpreadFree repair scan
Crashes, No Sound, or Screen Glitches?Free driver scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.