October DealsAmazon USOctober deal check: compare before you payAmazon US: current deals, useful picks and tech finds.Check DealsClean PCRecommendedOne scan can reveal what keeps slowing WindowsLook for cleanup and repair opportunities.Run ScanOctober DealsAmazon USDeal season is back - check today's better picksAmazon US: current deals, useful picks and tech finds.See Picks×
Skip to content
The Finance Base
The Money Desk · Blog
Re:

Gartner Forecasts Power Constraints at 40% of Existing AI Data Centers by 2027

Gartner’s 40% figure is a forecast, not a count of data centers already short of electricity. The constraint is the ability to deliver power to sites as AI demand grows.
From TheFinanceBase Team3 min to read

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Gartner forecasts that power availability will operationally constrain 40% of existing AI data centers by 2027. That is a prediction, not a report that 40% are already short of electricity. The issue is whether power can be delivered to a site at the capacity and pace operators need—not simply whether enough electricity is generated in aggregate.

What Gartner’s 40% forecast means

In a November 12, 2024 announcement, Gartner said 40% of existing AI data centers would be operationally constrained by power availability by 2027. The announcement does not provide a detailed methodology or geographic breakdown, so the estimate should be treated as Gartner’s forecast rather than a verified, uniform outlook for every country or operator. Gartner’s 2024 announcement

A facility can face a power constraint even when electricity is being generated elsewhere. Generation must be supplemented by the transmission and distribution infrastructure needed to deliver power to the site, and utility expansion takes time. Gartner says the rapid growth of new hyperscale facilities for generative AI is increasing demand faster than utilities can expand capacity.

How much power Gartner expects AI servers to need

Gartner estimated that data centers would need 500 terawatt-hours (TWh) per year in 2027 to run incremental AI-optimized servers. It described that requirement as 2.6 times the 2023 level. This figure refers to incremental power for those AI-optimized servers; it is not an estimate of total electricity use by all data centers. The same announcement said data center forecasts over the following two years reached as high as 160% growth. These are Gartner estimates and forecasts, not measured outcomes, and the announcement does not detail how the figures were calculated. Gartner’s 2024 announcement

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
#1 Best Overall
AC/DC Adapter for AI Prime HD+ Aquarium LED - AquaIllumination JYH32-2402500 10136 Power Supply Cord Charger PSU
  • Brand New, High Quality Replacement Cord
  • Tested Units. In Great Working Condition.

Why electricity delivery can become a bottleneck

Gartner’s concern is that new data-center demand can arrive sooner than the infrastructure required to serve it. New generation, transmission lines and distribution capacity may take years to come online, while data-center operators need power for facilities they are planning or expanding now. In that situation, available power can influence where projects are built, how quickly they open and whether they can operate at planned capacity. Gartner warned that power availability could govern near-term data-center construction and generative-AI growth.

The effects will depend on local conditions. Gartner’s announcement does not break down its forecast by country, grid or operator, and it does not establish that every data center will face the same degree of constraint.

Potential cost and emissions effects

Gartner warns that competition for power could raise data-center operating costs and pass costs through to AI and generative-AI service providers. That is a risk Gartner identifies, not a guarantee that costs will rise by the same amount for every operator or customer. Its announcement gives no common price increase to apply across markets.

Rank #2
Auotac 1000W Fully Modular Power Supply, 80+ Gold PSU, ATX 3.1 & PCIe 5.1 Ready, Native Dual-Color 12V-2x6 Cable, RGB Low-Noise Smart Fan, 105°C-Rated Capacitors, Black
  • 80 PLUS GOLD CERTIFIED: Delivering gold-level performance with 92% efficiency, ensuring effective power transmission to your components.
  • Fully Modular Design: Unique dragon-pattern fully modular cables cut redundant wiring to tidy your chassis, improve airflow and optimize system heat dissipation. With dimensions of 150×150×86mm (5.91×5.91×3.39in), the PSU fits most mainstream ATX cases.
  • Support ATX 3.1 & PCIe 5.1: Compliant with the ATX 3.1 standard to fuel high-performance PC components with stability, efficiency, and power spike resistance. Meanwhile, supporting PCIe 5.1 platform withstands 2x transient power excursions from the GPU.
  • Dual-Colour 16-Pin Cable: The Dual-color dragon-pattern 12V-2x6 PCI-E 5.1 cable for modern high-end graphics cards. With yellow connector can easily show you whether the cable has been plugged in properly.
  • RGB Silent Fan & RGB Lighting Model: This 140mm low-noise fan comes with a silent mode, it outperforms standard 120mm fans in terms of quietness, heat dissipation capability and durability. What's more, the psu features ARGB lighting model, allowing you to adjust the lights style according to your needs.

Gartner also says fast-rising demand could make emissions goals harder to meet if suppliers rely on short-term power sources, including keeping some fossil-fuel plants online longer than planned. It notes that wind and solar need an alternative supply when they are not generating if data centers require continuous power. This is Gartner’s analysis of the challenge, not a full assessment of storage, grid balancing or clean-energy contracting.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What data-center operators can assess now

Gartner recommends evaluating exposure to power shortages and planning for electricity costs, rather than assuming that planned utility capacity will arrive on schedule. Its recommendations include:

  • Assess which products and services depend on facilities or regions exposed to power constraints.
  • Anticipate the possibility of higher power costs and consider long-term data-center service contracts that account for power.
  • Revisit emissions goals against expected power requirements and the reliability of the available supply.
  • Reduce the computation required for generative-AI applications where practical; Gartner names smaller language models and edge computing as options to evaluate.

These are planning measures, not a promise that any single action will remove a site’s power constraint. The appropriate response depends on the application, location, grid access, cost and reliability requirements.

Rank #3
Sale
HP 720620-B21 - HP 1400W Flex Slot Platinum Plus Hot Plug Power Supply Kit (Renewed)
  • Product Condition: This item has been professionally restored to look and function like new. It comes with relevant accessories, a minimum 90-day warranty, and may be packaged in a generic box
  • Power Efficiency: Achieve up to 94% power efficiency with our 80Plus Platinum-certified power supplies, ensuring optimal data center performance
  • Power Capacity: Supports up to 1400 watts of power, providing ample capacity for high-performance servers and data center equipment
  • Flexible Slot Design: Compatible with Flex Slot power supplies, offering versatile installation options in your server rack or data center
  • Hot-Plug Capability: Allows for safe and easy installation or removal of the power supply while the system is still running, minimizing downtime
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

Could small modular reactors help?

Gartner presents small modular reactors (SMRs) as a possible longer-term source of dedicated on-site power, not a near-term fix. In an April 15, 2025 Q&A, Gartner analyst Bob Johnson said the company forecasts that the first SMR-powered data centers will be operational by 2030. The same Q&A says general availability may be 8–10 years away, early models will be expensive, radioactive waste must be managed, and regulatory and development challenges remain. Gartner also describes the concept as unproven. Gartner’s 2025 SMR Q&A

Those dates are Gartner forecasts, not confirmation that an SMR-powered data center is operating or that reactors will become available on a particular schedule. Operators weighing the option would need to consider cost, dependable delivery, emissions, site and grid conditions, and regulatory and technology readiness.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

More post from the Money Desk

  1. The Money DeskBlogTheFinanceBase07 MAR 2625 minWhat Is a 457 Plan?
  2. The Money DeskBlogTheFinanceBase07 MAR 2621 minTime Value of Money: What It Is and How It Works
  3. The Money DeskBlogTheFinanceBase07 MAR 2627 minAre You Living in One of These Top 10 Most Expensive Cities to Retire?
Recommended PC Tool
Recommended PC Tool
Windows Errors? Fix Them Before They SpreadFree repair scan
Crashes, No Sound, or Screen Glitches?Free driver scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.