Free tools Windows power users keep installed
One-click scans. No signup required.
Meta’s lease of Bellevue’s Block 13 was reported as the company’s fifth Spring District building, but it was a historical lease—not a new 2026 expansion. The nine-story building opened in 2024; later reporting says Meta never occupied it and was marketing the space for sublease by August 2026.
What Meta leased in Bellevue
Windermere’s republication of a 425Business report described Block 13 as Meta’s fifth leased building in the Spring District and put the new lease at 213,000 square feet. It said Meta’s total leases in the district would reach 1.4 million square feet. The republication does not show the original story’s publication date, so those figures should be read as the historical report’s numbers—not as a current measure of occupied space. Windermere / 425Business report
The Spring District developer describes Block 13 as a nine-story building with 212,000 rentable square feet, opened in 2024 and 100% leased to Meta. The lease figure in the earlier report and the developer’s rentable-area figure are close but not identical; they are attributed to different sources and should not be treated as interchangeable measurements. The Spring District: Block 13
Is Meta subleasing Block 13?
As of August 10, 2026, Seattle Red reported that the entire 212,128-square-foot Block 13 was being marketed for sublease. The report said the building was delivered unfinished and had never been occupied by Meta. A lease can exist without the tenant completing a fit-out or moving in, so the developer’s leased-to-Meta designation does not by itself establish employee occupancy. Seattle Red, August 10, 2026
#1 Best Overall
- CARDBOARD MONKENAUT — Get our best Gorilla Tag bundle yet with this Amazon exclusive deal. Purchase Meta Quest 3S to get exclusive items, including the Gorilla Space Program Suit and Helmet, plus 2,000 SHINY ROCKS.
- NO WIRES, MORE FUN — Break free from cords. Game, play and explore immersive worlds — untethered and without limits.
- 2X GRAPHICAL PROCESSING POWER — Enjoy lightning-fast load times and next-gen graphics for smooth gaming powered by the Snapdragon XR2 Gen 2 processor.
- EXPERIENCE VIRTUAL REALITY — Take gaming to a new level and blend virtual objects with your physical space to experience two worlds at once in your VR headset.
- 2+ HOURS OF BATTERY LIFE — Charge less, play longer and stay in the action with an improved battery that keeps up. *Based on the graphic performance of the Qualcomm Snapdragon XR2 Gen 2 platform vs the Meta Quest 2 platform.
Seattle Red said Meta signed a 15-year pre-lease in October 2021, with options to extend by 17 years, citing CBRE marketing materials. That is the term as described in the marketing-material account, not independently confirmed lease text.
How Block 13 compares with Meta’s other Spring District buildings
Published areas differ because sources use distinct measures and descriptions. The figures below preserve each source’s wording rather than combining them into a single campus total.
Rank #2
- CARDBOARD MONKENAUT — Get our best Gorilla Tag bundle yet with this Amazon exclusive deal. Purchase Meta Quest 3 to get exclusive items, including the Gorilla Space Program Suit and Helmet, plus 2,000 SHINY ROCKS.
- NEARLY 30% LEAP IN RESOLUTION — Experience every thrill in breathtaking detail with sharp graphics and stunning 4K+ Infinite Display.
- NO WIRES, MORE FUN — Break free from cords. Game, play and explore in immersive worlds — untethered and without limits.
- 2X GRAPHICAL PROCESSING POWER — Enjoy lightning-fast load times and next-gen graphics for smooth gaming powered by the Snapdragon XR2 Gen 2 processor.
- EXPERIENCE VIRTUAL REALITY — Blend virtual objects with your physical space and experience two worlds at once in your VR headset.
| Building | Reported area and measure | Stories and delivery | Lease or occupancy context |
|---|---|---|---|
| Block 13 | 212,000 rentable square feet (developer); 212,128 square feet (Seattle Red, 2026); 213,000 square feet in the historical lease report | Nine stories; opened in 2024 (developer) | Developer lists Meta as tenant; Seattle Red reported in August 2026 that it had never been occupied and was marketed for sublease |
| Block 6 | 329,000 square feet (developer); King County lists 273,049 total RSF and 270,673 net SF in its note for the 2025 assessment-year report | Eleven floors; opened in 2023 (developer) | Developer page lists Meta; Seattle Red reported the building was subleased to Snowflake in 2024 |
| Block 5 | Wright Runstad lists 345,000 square feet in project details and says the building contains 332,000 square feet; King County lists 331,724 square feet | Eleven stories; opened in 2024 (Wright Runstad) | Wright Runstad lists Meta; Seattle Red reported it went up for sublease in 2025 |
| Block 24 | 198,500 square feet (developer) | Ten stories; opened in 2021 | Developer says its office space is fully leased by Meta |
Sources: Block 13, Block 6, Wright Runstad: Block 5, Block 24, Seattle Red, and King County’s 2025 assessment-year report.
King County’s report uses project and assessment figures current to July 31, 2025, and labels the relevant Eastside projects “under construction or recently delivered.” Its area values are not the same measure as rentable-area figures on leasing or developer pages. The developer’s Block 6 page also still identifies Meta as the tenant, while later reporting describes a Snowflake sublease; the timing and type of tenancy explain why the descriptions can differ.
Quick wins for a faster PC:
Scan for outdated or missing drivers - takes under a minuteDriver Scan →Repair Windows errors before they cause bigger problemsFix Now →Rank #3
- NO WIRES, MORE FUN — Break free from cords. Game, play, exercise and explore immersive worlds — untethered and without limits.
- 2X GRAPHICAL PROCESSING POWER — Enjoy lightning-fast load times and next-gen graphics for smooth gaming powered by the SnapdragonTM XR2 Gen 2 processor.
- EXPERIENCE VIRTUAL REALITY — Take gaming to a new level and blend virtual objects with your physical space to experience two worlds at once.
- 2+ HOURS OF BATTERY LIFE — Charge less, play longer and stay in the action with an improved battery that keeps up.
- 33% MORE MEMORY — Elevate your play with 8GB of RAM. Upgraded memory delivers a next-level experience fueled by sharper graphics and more responsive performance.
What the lease and sublease reports do—and do not—show
The reported Block 13 lease indicates that Meta had secured space in the district. It does not establish how many employees worked there, whether the premises were fitted out, or how much space Meta currently occupies. Later sublease marketing makes the distinction especially important: a leased building, a delivered building, and an occupied workplace are different things.
The Spring District describes its Meta campus design as including pedestrian paths, outdoor spaces, daylight access, and native plants. Those are the developer’s stated design features, not independent evidence of employee experience or workplace outcomes. The Spring District: Meta
Quick Recap
Rank #4
- NEARLY 30% LEAP IN RESOLUTION — Experience every thrill in breathtaking detail with sharp graphics and stunning 4K Infinite Display.
- NO WIRES, MORE FUN — Break free from cords. Play, explore and exercise in immersive worlds — untethered and without limits.
- 2X GRAPHICAL PROCESSING POWER — Enjoy lightning-fast load times and next-gen graphics for smooth gaming powered by the Snapdragon XR2 Gen 2 processor.
- EXPERIENCE VIRTUAL REALITY — Blend virtual objects with your physical space and experience two worlds at once.
- 2+ HOURS OF BATTERY LIFE — Charge less, play longer and stay in the action with an improved battery that keeps up.
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.




