Scan for outdated or missing drivers - takes under a minuteDriver Scan →Clear out junk files and repair common Windows errorsFree Scan →Fix the driver behind crashes, sound loss and screen glitchesFind Drivers →Project Oasis was Travelers’ planned data center in Sarpy County, Nebraska. Contemporary reporting identified the company as Travelers Insurance; Nebraska incentive records name The Travelers Indemnity Company, a Travelers group entity, as the participating project company.
What Project Oasis was
Project Oasis was a codename for a proposed large-scale data center, not a separate company or an insurance product. The project became public in 2013 amid competition between Nebraska and Iowa to attract an unidentified data-center development. Contemporary coverage identified Travelers on September 16, 2013, ahead of a Sarpy County board decision. Data Center Knowledge reported the earlier competition, then identified Travelers and described the proposal.
The project was intended to complement Travelers’ existing data-center presence in Georgia. Later coverage described the Nebraska facility as a major data-processing hub for the company. Data Center Dynamics covered the facility’s role.
Which Travelers company was involved?
- Travelers Insurance: The shorthand used by contemporary industry coverage to identify the company behind Project Oasis.
- The Travelers Companies, Inc.: The broader corporate group.
- The Travelers Indemnity Company: The project entity named in Nebraska incentive records.
These names refer to different levels of identification. Calling the project “Travelers Insurance” answers the historical question, but it should not be read as confirmation that this was the precise legal entity on every project document. Nebraska’s 2025 incentive report lists The Travelers Indemnity Company for the Papillion project.
Free tools Windows power users keep installed
One-click scans. No signup required.
#1 Best Overall
- Save valuable floor space: 6U wall mount server cabinet Dimensions: 13.78" H x21.65" W x17.72" D.Maximum mounting depth is 14.2"
- Keep critical network equipment secure: glass door and side panels are lockable to prevent unauthorized access. Front door can be installed on either side of the front of the cabinet to satisfy your door swing orientation preference
- Easy equipment configuration: Fully adjustable mounting rails and numbered U positions, with square holes for easy equipment mounting with top and bottom punch-out panels for easy cable access
- Durability: Made of high quality cold rolled steel holds up to 110lb (50kg) (Easy Assembly Required)
- PCI & HIPPA and EIA/ECA-310-E compliant
Where the Nebraska facility was located
The 2013 announcement described the proposed site as near Springfield, Nebraska, in Sarpy County and the Omaha metropolitan area. Later reporting associated the completed facility with the Papillion area. These are different geographic descriptions of the same Sarpy County development, not evidence of separate Project Oasis sites. Morrissey Engineering places the facility near Nebraska Highway 50 and Schram Road. Its project account gives the later location description.
What the project’s size and employment figures mean
The figures refer to different stages and measures; the $200 million announcement estimate should not be treated as a final audited cost.
| Measure | Reported figure | What it establishes |
|---|---|---|
| Public project estimate | Approximately $200 million | The rounded value attached to the 2013 announcement, not a confirmed final expenditure. Contemporary announcement coverage. |
| Planned investment in state records | $215 million | Nebraska’s 2025 incentive report lists this as planned investment for The Travelers Indemnity Company’s Papillion project; it does not establish the completed facility’s actual cost. Nebraska Department of Revenue report. |
| Completed building area | Approximately 183,000 square feet | The size reported for the completed Sarpy County facility. Morrissey Engineering. |
| Planned employment | 30 full-time-equivalent positions | The state report’s planned figure, not proof of final staffing. The 30-job threshold also appeared in Nebraska’s large-data-center incentive criteria. Area Development describes the program context. |
The $200 million and $215 million figures are not interchangeable: one was the public announcement estimate, while the other is a later planned-investment amount in state incentive reporting. Likewise, a 30-position plan or eligibility threshold does not establish total facility employment or the number of jobs ultimately filled.
Rank #2
- Save valuable floor space: 12U wall mount server cabinet Dimensions: 24.25" H x21.65" W x17.72" D. MAXIMUM MOUNTING DEPTH is 14.2".
- Keep critical network equipment secure: glass door and side panels are lockable to prevent unauthorized access; Front door can be installed on either side of the front of the cabinet to satisfy your door swing orientation preference
- Easy equipment configuration: Fully adjustable mounting rails and numbered U positions, with square holes for easy equipment mounting with top and bottom punchout panels for easy cable access
- Durability: Made of high quality cold rolled steel holds up to 110lb (50kg) (Easy Assembly Required)
- PCI & HIPPA and EIA/ECA-310-E compliant
Why the project used a codename
Available contemporaneous coverage places Project Oasis in a competitive site-selection process: Nebraska and Iowa were vying for a major project while incentives and local approvals were under consideration. The codename was part of that confidential development context. Travelers’ identity became public when the company issued a statement ahead of a county decision. The reporting establishes use of the name “Project Oasis,” but not who coined it. The July 2013 account describes the competition; the September report identifies Travelers.
Do these 3 things before closing this tab:
1Repair Windows errors before they cause bigger problems2Fix the driver behind crashes, sound loss and screen glitches3Clear out junk files and repair common Windows errorsHow Nebraska supported the development
Reports described a package of site, utility, workforce, and economic-development measures rather than a project financed solely by public funds. The plan included land held under option by the Sarpy County Economic Development Corporation, rezoning for light-industrial use, and a new Omaha Public Power District substation. State and local development organizations were also involved, with customized job-training support reported for technical employees. Area Development reports on the support and incentive context; Data Center Knowledge describes the development plan.
Nebraska’s Tier 2 Large Data Center program was reported with a minimum $200 million investment and 30 full-time jobs. Those criteria explain why the project was discussed in connection with incentives; they do not show that Travelers claimed every available benefit or establish the value of any benefits ultimately received.
Rank #3
- Sturdy:4u server rack is construct from cold rolled steel, with a weight capacity of 110lbs(50kg); Electrostatic powder coat prevents rust and corrosion,quality finish
- Direct use:Open and use, not having to assemble it.Network rack can be placed flat or mounted on the wall,also can be installed vertically under the table
- Design Features:maximum mounting depth of 14 in,cables can be fixed on the side panel;Open frame server rack achieves effortless inspection, replacement and assemble
- Installation:wall mount network rack is easy to install,with instructions or videos for reference;Equipped with multiple accessories, suitable for different needs
- Application:EIA/ECA-310-E Compliant;wall mounted 4u rack fits all 19" racks and cabinets to hold various IT, network, and AV equipment;wall mount rack available in 4U, 6U, and 8U to choose
What happened after the 2013 announcement
Later reporting indicates that the proposed project was built and opened. Morrissey Engineering reported a ribbon-cutting for the approximately 183,000-square-foot facility, while Data Center Dynamics described Travelers as having opened a $200 million Nebraska data center. Morrissey Engineering’s facility account and Data Center Dynamics’ coverage document the completed project. Site Selection described it as Travelers’ second major U.S. data center and discussed the expected employment and incentive framework. Site Selection’s account supports that broader context.
The historical sources establish completion and the facility’s reported role at the time, but they do not establish its current operating status, staffing, capacity, later expansions, or whether it remains Travelers’ principal Nebraska data-processing site.
Project Oasis timeline
- July 31, 2013: Data Center Knowledge reported Nebraska and Iowa competing for an unidentified project called Project Oasis. Read the contemporaneous report.
- September 16, 2013: Data Center Knowledge identified Travelers Insurance as the company behind the planned data center near Springfield. Read the identification report.
- 2013 agreement year: Nebraska incentive records list The Travelers Indemnity Company’s Papillion project with $215 million in planned investment and 30 planned full-time-equivalent positions. See the 2025 state report.
- By 2015: Later coverage described the facility as open or scheduled to open; the sources support completion but do not establish a precise opening date from a primary announcement. Site Selection’s coverage.
The University of Nebraska Bureau of Business Research also includes Travelers among Sarpy County’s major data centers in its analysis of the county’s data-center development. See the Bureau’s publication.