Recommended Free Tools
On June 13, 2024, the U.S. Space Force selected Blue Origin, SpaceX and United Launch Alliance (ULA) for National Security Space Launch Phase 3 Lane 1 contracts. They did not receive equal shares of $5.6 billion: the awards put the companies in a pool to compete for individual missions, with payment tied to later task orders. The program has since expanded, and early Lane 2 missions went to SpaceX and ULA—not Blue Origin.
What the Space Force awarded in June 2024
The June 2024 decision was an initial set of multiple-award, indefinite-delivery, indefinite-quantity (IDIQ) contracts for Phase 3 Lane 1. In practical terms, the contracts established a framework under which the Space Force could order launches and providers could compete for specific work. A contract award made a company eligible to compete; it did not guarantee a mission or payment of the full potential value.
As an Amazon Associate I earn from qualifying purchases.
The Space Force expected Lane 1 to cover at least 30 missions over a five-year ordering period, using firm-fixed-price task orders. Blue Origin’s initial award included a $5 million task order for capability assessment and mission-assurance work. Contemporary coverage reported about $1.5 million apiece in related risk-reduction and security work for SpaceX and ULA. Those initial assessment amounts were not the value of future launch missions. Space Systems Command’s June 2024 announcement describes the contract framework and Blue Origin assessment; the SpaceX and ULA comparison was reported by Daily Galaxy in June 2024.
The original “$5.6 billion” headline referred to a prospective launch opportunity reported at the time, not an immediate payout or a guaranteed sum divided among the three firms. The accessible official June 2024 announcement confirms the contract structure but does not establish the exact calculation behind that headline figure.
#1 Best Overall
- BEGINNER MODEL-ROCKET LAUNCH SET: The Tandem-X rocket-model launch set offers adults and kids ages 10+ hours of fun during the holidays as they complete and launch our Amazon and Crossfire ISX rocket models. This set includes the easy-to-assemble Amazon model parts, the Crossfire ISX model parts, parachutes, and the launch pad system. It requires rocket engines, Starters, Recovery Wadding, and 4 high-quality 1.5-volt AA alkaline batteries for launch use (sold separately).
- 2 SOARING ALTITUDE HEIGHTS: Our Tandem X set offers a high-performing power duo with our giant 30-inch Amazon model (600-foot projected altitude with a C6-5 rocket engine) and our streamlined 15.6-inch Crossfire ISX model (1,150-foot projected altitude with a C6-7 rocket engine). Other compatible Estes model-rocket engines for Amazon model: B4-2, B4-4, B6-2, B6-4, C5-3, and C6-3. Other compatible engines for Crossfire ISX: A8-3, B4-4, B6-4, and C6-5. All engines sold separately.
- READY TO ASSEMBLE: Our beginner model-rocket launch set comes with 2 build options. The precolored Amazon model features plastic fins and self-stick graphics and can be built in an hour. The Crossfire ISX model comes with laser-cut wood fins, self-stick decals, and aerodynamic parts. Pair the rockets with the included Porta Pad II Launch Pad and Electron Beam Launch Controller for a hands-on educational activity or a unique Christmas gift for a budding scientist or a space aficionado.
- SAFETY FIRST, FUN ALWAYS: Our rockets and rocket launch accessories are designed to be used with the NAR (National Association of Rocketry) model-rocket safety code. Always ensure you have an appropriate launch site, stand back at least 15 ft., insert the safety key, issue a countdown, and then you can let your rocket fly!
- WE IGNITE IMAGINATIONS: Since 1958, Estes has created educational rocket kits and displays designed for an unforgettable aerospace experience. As a family-owned company, we have grown to offer exciting STEM products that engage aspiring rocketeers and the future minds of aerospace.
What NSSL Phase 3 is—and why it has two lanes
National Security Space Launch (NSSL) is the Space Force’s framework for procuring launches that carry military and intelligence spacecraft into orbit. Phase 3 covers fiscal years 2025 through 2029 and divides missions according to their risk tolerance and assurance needs. The Space Force’s April 2025 Lane 2 announcement described an anticipated manifest of about 84 missions: approximately 30 in Lane 1 and 54 in Lane 2. These are projected mission counts, not a guarantee that every mission will be ordered or launched.
| Feature | Lane 1 | Lane 2 |
|---|---|---|
| Mission profile | More commercial-like missions for which a more risk-tolerant approach may be suitable | The most demanding, least risk-tolerant national-security missions |
| Competition and assurance | Broader provider pool, including later on-ramps; tiered mission assurance can match oversight to mission needs | Three providers selected for the Phase 3 awards, with the highest reliability and assurance requirements |
| Projected Phase 3 missions | About 30 | About 54 |
| Initial contract framework | Multiple-award IDIQ contracts with firm-fixed-price task orders | Firm-fixed-price, indefinite-delivery requirements contracts |
| Current provider picture | Expanded beyond the 2024 cohort to seven providers by July 2026 | SpaceX, ULA and Blue Origin hold contracts, but mission assignments have not been evenly distributed |
The two-lane structure reflects a trade-off. Competition and additional domestic launch options can improve resilience and put pressure on costs, while emerging vehicles bring schedule and mission-assurance risks. The Space Force has said Lane 1 can use tiered mission assurance, with oversight tailored to a mission’s risk and requirements. Its industry-day description of the approach explains that distinction. Lane 1 eligibility does not by itself establish readiness for Lane 2’s most demanding missions.
Why Blue Origin was included
When the initial awards were announced, Blue Origin was the new entrant. Its New Glenn rocket was in development as a heavy-lift orbital vehicle, and its inclusion gave the company a route to compete for national-security missions while adding another potential domestic launch provider.
The Tool Desk
Outbyte PC Repair FREEClear out junk files and repair common Windows errorsFree Scan →Outbyte Driver Updater FREEFix the driver behind crashes, sound loss and screen glitchesFind Drivers →Rank #2
- MODEL-ROCKET LAUNCH PAD AND CONTROLLER: Estes rocket model kits require the right launch system for any show-stopping launch powered by mini, standard A to C, and D engines for versatile flying. It includes a Porta-Pad II Launch Pad and Electron Beam Launch Controller to complete the system. A 3/16-inch (5-millimeter) Maxi Launch Rod (sold separately) is compatible for larger models.
- MADE FOR MINI, STANDARD A to C, and D ENGINE ROCKETS: The Porta-Pad II Launch Pad and Electron Beam Launch Controller is an all-in-one combo provides everything you need to power up your flights.
- IMPORTANT LAUNCH ACCESSORY: Whether you’re working with a beginner model rocket or an advanced-level replica, this launch system belongs in your setup. Designed for quick assembly without glue or tools, this launch system includes a pad and controller.
- SAFETY FIRST, FUN ALWAYS: Our rockets and rocket launch accessories are designed to be used with the NAR (National Association of Rocketry) model-rocket safety code. Always ensure you have an appropriate launch site, stand back at least 15 ft., insert the safety key, issue a countdown, and then you can let your rocket fly!
- WE IGNITE IMAGINATIONS: Since 1958, Estes has created educational rocket kits and displays designed for an unforgettable aerospace experience. As a family-owned company, we have grown to offer exciting STEM products that engage aspiring rocketeers and the future minds of aerospace.
That selection was not a finding that New Glenn was already operational or certified for the most demanding national-security launches. Blue Origin had assessment and mission-assurance work to complete, and its vehicle’s maturity and schedule were less established than those of the incumbent providers at the time. The broader rationale was to develop competition and industrial-base capacity without treating a new entrant as interchangeable with established launch providers.
What the later Lane 2 contracts were worth
On April 4, 2025, the Space Force awarded separate Phase 3 Lane 2 contracts to the same three companies. These anticipated values cover projected mission requirements through FY2029; they are not necessarily guaranteed revenue. The published mission projections also show that this was not an equal three-way split.
| Provider | Anticipated Lane 2 contract value | Projected missions | Timing note |
|---|---|---|---|
| SpaceX | $5,923,580,297 | 28 | About 60% of the projected Lane 2 missions |
| United Launch Services / ULA | $5,366,439,406 | 19 | About 40% of the projected Lane 2 missions |
| Blue Origin | $2,386,234,812 | 7 | Projected to begin in Order Year 2 |
The three published Lane 2 values total about $13.676 billion when added together; that is a calculation from the company-specific figures, not a separate total stated by the Space Force. The figures belong to the later Lane 2 awards and should not be confused with the $5.6 billion estimate associated with the original Lane 1 headline. Space Systems Command’s Lane 2 award announcement sets out the anticipated values, mission projections and contract type.
Rank #3
- BEGINNER MODEL ROCKET LAUNCH SET: The Estes Alpha III launch set lets kids ages 10+ and hobbyists easily build and launch this iconic model rocket. The model rocket kit includes rocket parts, engine mount, decals, a parachute, a launch pad system, and instructions. For blastoff, you’ll need Estes rocket engines, Starters, Recovery Wadding, and 4 high-quality 1.5-volt AA alkaline batteries (not included).
- SOARS UP TO 1,150 FT.: Our Alpha III model rocket is designed for first-time STEM kit builders and climbs up to a projected altitude of 1,150 ft. (351 m). It’s compatible with 1/2A6-2, A8-3, A8-5, B4-4, B6-4, B6-6, C6-5, or C6-7 Estes rocket engines (sold separately).
- READY TO ASSEMBLE: Rocket building sparks creativity and a love for science and outer space! This beginner Alpha III model kit is easily put together with 1 hour of preparation and includes decals. It comes with a Porta-Pad II Launch Pad and Electron Beam Launch Controller for an unforgettable blastoff for first-time rocketeers.
- SAFETY FIRST, FUN ALWAYS: Our rockets are designed to be used with the NAR (National Association of Rocketry) model-rocket safety code. Always ensure you have an appropriate launch site, stand back at least 15 ft., insert the safety key, issue a countdown, and then you can let your rocket fly!
- ESTES EDUCATION: Since 1958, Estes has created educational rocket kits designed for an unforgettable launch experience. As a family-owned, US-based company, we offer exciting and engaging STEM products for all interests, skills, and power levels.
Which companies received missions first?
FY25: SpaceX and ULA received assignments
On April 7, 2025, the Space Force assigned seven FY25 Lane 2 missions to SpaceX for $845.8 million and two to ULA for $427.6 million. Blue Origin received no FY25 Lane 2 assignment; the Space Force had identified FY26 as its first opportunity. The missions included National Reconnaissance Office, GPS IIIF, missile-warning and classified work. The FY25 assignment announcement provides the public details.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
FY26: Blue Origin’s Lane 2 opportunity moved to FY27
On October 3, 2025, the Space Force assigned five FY26 Lane 2 missions to SpaceX for $714 million and two to ULA for $428 million. Blue Origin received none; its next Lane 2 opportunity was identified as FY27. A company can hold a Phase 3 contract and still receive no mission in a given fiscal year. The FY26 announcement records those assignments.
Blue Origin’s Lane 1 task order and the 2026 anomaly
Blue Origin did receive concrete launch work under Lane 1. On May 29, 2026, Space Systems Command announced a task order for one NRO mission set, scheduled to launch from Cape Canaveral Space Force Station between the fourth quarter of calendar year 2027 and the first quarter of 2028.
Rank #4
- BEGINNER MODEL ROCKET LAUNCH SET: This Estes rocket model launch set offers kids ages 10+ the chance to blast off our 2 ready-to-fly 1499 Rascal and Hijinks models—no building required! This set includes the fully assembled 1499 Rascal and Hijinks rocket models, parachutes, and the launch pad system. It requires rocket engines, Starters, Recovery Wadding, and 4 high-quality 1.5-volt AA alkaline batteries for launch use (sold separately).
- SOAR UP TO 1,100 FT.: Our 1499 Rascal and Hijinks model rockets help you reach the skies faster with the included Estes rocket launch pad system. They have a projected altitude of 1,100 ft. (335 m) when used with a C6-7 Estes model-rocket engine (sold separately). They are also compatible with A8-3, B4-4, B6-4, C6-5, or A10-3T rocket engines.
- READY TO FLY: Rocket launch sets are creative, educational gift ideas for Christmas day or special-occasion surprises! Our dual beginner rocket launch set comes decorated and ready to launch with the included Porta Pad II Launch Pad and Electron Beam Launch Controller. Get outside faster and prepare for a successful and memorable blastoff!
- SAFETY FIRST, FUN ALWAYS: Our rockets are designed to be used with the NAR (National Association of Rocketry) model-rocket safety code. Always ensure you have an appropriate launch site, stand back at least 15 ft., insert the safety key, issue a countdown, and then you can let your rocket fly!
- WE IGNITE IMAGINATIONS: Since 1958, Estes has created educational rocket kits designed for an unforgettable launch experience. As a family-owned company, we have grown to offer exciting STEM products that engage aspiring rocketeers and the future minds of aerospace.
The announcement followed a New Glenn integrated vehicle hot-fire anomaly the previous day. The Space Force said it would work with Blue Origin to determine the root cause and implement corrective actions. The task order shows Blue Origin’s selection progressed beyond an assessment, but the announcement does not establish that the technical issue had been resolved. Space Systems Command’s task-order notice gives the mission window and the agency’s stated response to the anomaly.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.The Lane 1 pool grew beyond the original three
The 2024 awards were the starting cohort, not a permanent limit on Lane 1 competition. Rocket Lab and Stoke Space were added in March 2025; Impulse Space and Relativity Federal joined in July 2026. Space Systems Command said the July additions brought the Lane 1 provider count to seven. The additions reflect the program’s use of on-ramps to broaden competition as providers become eligible.
- March 2025 on-ramp announcement: Rocket Lab and Stoke Space.
- July 2026 on-ramp announcement: Impulse Space and Relativity Federal.
How the program moved from contracts to actual work
The public milestones show why contract eligibility, mission assignments and completed launches should not be treated as the same thing.
Best Value
- BEGINNER MODEL ROCKET SET: The Estes Pathfinder launch set gives aspiring rocketeers ages 10+ the chance to build, launch, and recover these 2 flying model rockets. This set includes 2 rockets with rocket parts, design decals, recovery parachutes, launch pad system, and instructions. It requires Estes rocket engines, starters, recovery wadding, and 4 high-quality 1.5-volt AA alkaline batteries (sold separately).
- SOAR UP TO 1,000 FT.: The included Estes Porta-Pad II Launch Pad and Electron Beam Launch Controller make it easy for kids and beginners to aim for the stars. Each rocket model in this duo can soar to a projected altitude of up to 1,000 ft. (305 m) using a C6-5 Estes rocket engine (sold separately). It’s also compatible with the Estes A8-3 and B6-4 rocket engines.
- READY TO ASSEMBLE: This beginner rocket kits can be completed in approximately 1 hour or less. Then pair it with the included Estes Porta-Pad II Pad and Electron Beam Controller.
- SAFETY FIRST, FUN ALWAYS: Our rockets are designed to be used with the NAR (National Association of Rocketry) model-rocket safety code. Always ensure you have an appropriate launch site, stand back at least 15 ft., insert the safety key, issue a countdown, and then you can let your rocket fly!
- WE IGNITE IMAGINATIONS: Since 1958, Estes has created educational rocket kits and displays designed for an unforgettable aerospace experience. As a family-owned company, we have grown to offer exciting STEM products that engage aspiring rocketeers and the future minds of aerospace.
- June 13, 2024: Blue Origin, SpaceX and ULA received the initial Lane 1 contracts.
- October 18, 2024: SpaceX received Lane 1 task orders totaling $733,566,001 for seven Space Development Agency launches and an NRO mission set. Space Systems Command’s task-order announcement gives the total and mission scope.
- March 27, 2025: Rocket Lab and Stoke Space joined the Lane 1 pool.
- April 4 and 7, 2025: Lane 2 contracts were awarded, then the first FY25 missions were assigned to SpaceX and ULA.
- October 3, 2025: FY26 Lane 2 assignments again went to SpaceX and ULA.
- May 29, 2026: Blue Origin received its Lane 1 NRO task order.
- July 2026: Impulse Space and Relativity Federal joined Lane 1.
Why the distinction matters
Military and intelligence satellites support capabilities including secure communications, navigation, missile warning and reconnaissance. A launch failure or major delay can therefore affect more than a commercial customer’s schedule. The Space Force is balancing assurance for high-consequence missions against the benefits of competition, additional domestic capacity and access for new providers.
The award structure is designed to match those priorities to mission needs: Lane 2 serves the most demanding requirements, while Lane 1 allows a broader set of providers to compete where the mission profile permits. Public information about some payloads and requirements is limited because missions may be classified.
Quick Recap
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.




