Do these 3 things before closing this tab:
1Repair Windows errors before they cause bigger problems2Fix the driver behind crashes, sound loss and screen glitches3Clear out junk files and repair common Windows errorsSome links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.
Montreal-based contract manufacturer KS2 says manufacturing resource planning (MRP) software helped it coordinate purchasing, bills of materials (BOMs), production planning, quotes, invoices and inventory as its business expanded. In a sponsored EE Times case study published September 1, 2024, KS2 reported that some new-product setup work fell from days to hours and that it could return quotes within 24–48 hours. Those are customer-reported results, not independently measured proof that software caused the company’s growth.
Why spreadsheets became a constraint for KS2
KS2 is a Montreal-based Canadian contract manufacturer of automotive assemblies and subassemblies that also provides engineering services. Founded in 2007, it had grown to about 40 employees by the time of the case study. Its work includes RV- and EV-related solutions. KS2’s website also describes capabilities in vehicle connectivity, industrial automation, green-energy systems, lithium-battery management, remote diagnostics, monitoring and industrial controls; that broader capability list does not establish that every area was part of the software implementation. KS2’s website provides the company’s current overview.
The spreadsheet replacement effort reportedly began in 2016, as the company faced more assembly types, purchasing activity, changing BOMs and departments that needed access to production information. Canada–U.S. business also made multi-currency transactions relevant. At that scale, a spreadsheet-led process can make it harder to ensure everyone is quoting, buying and building against the same approved part and revision.
- Separate files or informal handoffs can create conflicting BOM versions.
- Material requirements may need to be recalculated manually when demand or a revision changes.
- Purchasing decisions can lag when long-lead-time parts are not visible alongside production needs.
- Information may have to be re-entered between quoting, purchasing, production and invoicing.
- Knowledge concentrated in particular employees can make work harder to transfer across teams.
These are common risks of disconnected manufacturing administration; the case does not document that KS2 experienced each one. Its account does identify the rising number and complexity of assemblies, changing BOMs and need for broader access as pressures behind the search.
What KS2 selected—and what MRP means
KS2 sought an intuitive ERP or MRP system aimed at smaller manufacturers. Its owner reportedly assessed MRPeasy against four other systems and chose it in part because of the price point and perceived ease of use. The EE Times article is labeled Partner Content and lists MRPeasy as its author, so the account is sponsored customer evidence rather than independent product testing. It does not name the other systems or provide a comparison matrix.
MRP, or material requirements planning, centers on coordinating materials, purchasing, BOMs, inventory and production planning. ERP, or enterprise resource planning, is a broader category that can connect manufacturing with functions such as sales, finance, HR, quality and customer management. The case sometimes calls MRPeasy an ERP system, but the described operational changes are principally about manufacturing planning and linked business workflows.
#1 Best Overall
How KS2 used the system
KS2 used MRPeasy for parts, BOMs, purchases, production planning, BOM revisions, quotes, invoices, inventory and stock statistics, long-lead-time planning, and multi-currency transactions. The point of connecting these workflows is that a change in one area can inform work elsewhere: for example, a current BOM can support material planning, while inventory visibility can help purchasing assess what is already on hand.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
Adoption expanded gradually. Two people initially used the software; the case later describes use by supply-chain staff, customer service and engineering, with 15 active users at the time of publication. Engineers took responsibility for managing BOMs and revisions in the system. That cross-functional use matters: a purchasing database alone would not connect engineering changes with the people planning and making the product.
Rank #2
- Comprehensive Management: this red used car record book supports comprehensive tracking of used car transactions, providing an nice solution for title processing and auto tracking, optimizing your organizational processes
- Vibrant Color: attractive with the eye-catching red used car record book; Suitable for busy dealerships, its bold color ensures that you can quickly spot and retrieve the log book when needed, eliminating any unnecessary problem
- Reliable Paper Material: crafted from quality paper, this used car record book is built to last; It withstands frequent handling and long-term use, making it a dependable tool for tracking inventory over time and ensuring data integrity
- Ideal for Dealerships and Auctions: tailored for dealerships and auto auctions, the Used Car Log Book simplifies inventory management; Enhance your workflow and improve efficiency by organizing your title processing and auction records in one handy tool
- Suitable Size: measuring approximately 8-3/4 Inch x 13-1/3 Inch, this used car log book provides ample space for detailed entries; Keep track of every transaction and update without feeling cramped, ensuring your records are complete and precise
MRPeasy’s current site markets a wider set of functions, including production planning, inventory, sales management, workforce tracking, procurement, finances, lot and batch tracking, serial numbers, barcodes and reporting. This is current vendor product information, not evidence that KS2 used every listed feature. MRPeasy’s official site also currently positions the product for companies with 10–200 employees and offers a free-trial path; those present-day statements should not be read as the product’s exact positioning or feature set in 2024.
What improvements KS2 reported
| Area | Customer-reported result | What the case does not establish |
|---|---|---|
| Quoting | KS2 said it could respond to quote requests within 24–48 hours. | There is no prior turnaround figure, quote volume, win rate, or definition of which requests and engineering reviews are included. |
| New-product setup | KS2 said creating BOMs and linking them to production planning took a few hours instead of days; it also said new products could be prepared for manufacturing orders and invoicing the same day. | Product complexity, BOM depth, and whether routings, work instructions, quality checks or tooling were included are not specified. |
| Inventory and supply chain | KS2 reported better access to stock statistics and improved planning for long-lead-time items. | No quantified change in stock-outs, excess inventory, expedite costs, inventory value or working capital is provided. |
| Invoicing and cash flow | KS2 said invoicing became faster and helped cash flow; it also valued multi-currency functionality for Canada–U.S. business. | No days-sales-outstanding figure or measured cash-flow change is reported. |
| Adoption and scale | The company had 15 active users and about 40 employees at the time described. | The case does not provide a controlled comparison of staffing, output or productivity before and after implementation. |
Every result in the table comes from the customer account in the September 1, 2024 EE Times case study. It is useful evidence of what KS2 says changed, but not a benchmark a buyer should expect to reproduce. Faster billing could improve billing velocity and cash conversion, for example, yet the article does not quantify the effect.
Rank #3
- Used Book in Good Condition
What the case can—and cannot—say about growth
The case supports a narrower conclusion than its original headline suggests: KS2 says connected manufacturing workflows helped it handle greater operational complexity. It does not establish that MRPeasy caused revenue growth, that growth would not otherwise have happened, or that the software alone produced the reported time savings.
The Tool Desk
Outbyte Driver Updater FREEScan for outdated or missing drivers - takes under a minuteDriver Scan →Outbyte PC Repair FREEClear out junk files and repair common Windows errorsFree Scan →The article discloses no revenue growth, gross-margin change, inventory turns, on-time-delivery rate, defect rate, implementation cost, payback period or controlled before-and-after measurement. It also does not quantify labor saved, quote-to-order conversion, or cash-conversion improvement. The 40-person team is context about company scale, not a measured software outcome.
Rank #4
- Step-by-step procedures Linked to over 700 easy-to-follow photos and illustrations
- Complete troubleshooting section helps identify specific problems
- Written from hand-on experience based on a vehicle teardown and rebuild using commonly available tools
- Tips give valuable short cuts to make the job easier and eliminate the need for special tools
- 700 B/W photos
The account is also not a complete record of implementation risks: it does not address failed deployments, customers who later migrated away, downtime, data-cleaning effort, support limits, feature gaps, contract terms or total cost of ownership. A small manufacturer should treat it as one customer’s workflow story rather than proof of universal fit.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.How to evaluate MRP or ERP for a similar manufacturer
Before choosing a system, map the work it must control and the data on which its plans will depend. A product that fits a straightforward assembly operation may be inadequate where engineering changes, traceability or capacity planning are unusually complex.
Best Value
- Step-by-step procedures written from a complete teardown and rebuild, giving you the confidence to tackle repairs at any skill level.
- Over 700+ clear photos and diagrams that simplify complex systems, helping you complete jobs faster and with fewer mistakes.
- Comprehensive troubleshooting and fault-finding guides to quickly diagnose problems and reduce costly downtime.
Match the system to manufacturing complexity
- Count active SKUs and BOM levels, and assess how often designs change.
- Identify whether production is make-to-stock, make-to-order, configure-to-order or engineer-to-order.
- Check support for routings, work centers, labor, capacity, rework, scrap, substitutions and partial completions.
- Determine whether lot, batch or serial traceability is required.
- For engineering-heavy or regulated products, test whether basic BOM revision handling is enough or whether dedicated PLM, document control, quality or compliance workflows are needed.
Set rules for parts, BOMs and revisions
- Assign clear ownership for part numbers and BOM creation or approval.
- Confirm whether revisions can be effective-dated and whether the system keeps an audit history.
- Test customer-specific revisions and controls that prevent obsolete components from entering new work orders.
- Verify that engineering and production can identify and use the same approved revision.
Test the full commercial and material workflow
- Check whether material, labor, overhead and subcontracting costs can flow into quotes, and whether quote assumptions are retained.
- Trace an accepted quote through sales order, manufacturing order, purchasing and invoice without duplicate entry.
- Ask whether lead times reflect actual material availability and capacity rather than an assumed standard.
- Test available-to-promise inventory, purchase suggestions, safety stock, supplier lead times, alternate parts, cycle counts and customer-owned or consigned inventory where relevant.
- Confirm support for the currencies, customer-specific pricing and accounting connections the business actually uses.
Plan integrations, access and rollout
- List required connections to accounting, CAD or PLM, barcode scanners, shipping, payroll, time tracking, customer portals and other existing systems; verify API and import/export needs.
- Define roles and permissions before expanding access across engineering, customer service, purchasing, production and finance.
- Ask about data migration, training, support response, reporting, shop-floor or mobile usability, sandbox access and the option to roll out by department.
- Estimate the full cost of ownership, including subscriptions, implementation help, internal data cleanup, training and integrations. The KS2 article gives no implementation or subscription cost.
- Check hosting location, backups and recovery, audit history, confidentiality, retention requirements and any sector-specific obligations.
Choose the system category before choosing a vendor
MRP-first software can suit a smaller discrete manufacturer whose immediate need is to connect BOMs, purchasing, inventory and production planning. A broader ERP may be more appropriate when those workflows must share data with accounting, CRM, ecommerce, service or other operations. Engineering-led businesses may need PLM or document-control capabilities alongside MRP; shop-floor visibility or execution needs may call for MES integration. A spreadsheet-plus-accounting setup can remain reasonable for a very small, stable operation, but its limits should be assessed against revision control, traceability and cross-department handoffs.
Outdated Drivers Are Slowing You Down
One free scan finds every outdated or missing driver and matches the right update for your exact hardware.Free scan · exact hardware matchPC Slower Than It Used to Be?
A free scan shows the junk files, broken settings and background clutter dragging Windows down - then fixes them in one click.Free scan · Windows 10 & 11MRPeasy currently markets itself to manufacturers with 10–200 employees, a range that includes the approximately 40-person scale described for KS2. That is a vendor positioning claim, not independent validation of suitability. The decision should turn on a process demonstration using the manufacturer’s own representative BOM, revision, purchase and production scenarios—not company size alone. The 2024 case says KS2 found the system usable without expensive implementation consultants, but that customer experience does not show that every company can self-implement. Complex legacy data, multiple sites, accounting requirements or traceability needs can still warrant outside implementation support.
Quick Recap
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

